和平軟啟動器安裝及維修說明書
聲明:您必須遵守我們的協(xié)議,如果您下載了該資源行為將被視為對《電天下賬號管理規(guī)范》全部內(nèi)容的認(rèn)可,本網(wǎng)站資源來自原創(chuàng),僅供用于學(xué)習(xí)和交流,請勿用于商業(yè)用途。如有侵權(quán)、不妥之處,請舉報本資源,我們將及時審核處理!
和平軟啟動器安裝及維修說明書
和平軟啟動器安裝及維修說明書。
文本預(yù)覽
Installation and maintenance Instruction
Hapn softstarter range
HPS2 S18/30 300/515Contents
1. Softstarter Marking 3
2. Mounting 4
Drilling plan 4
Minimum distance to wall / front 4
3. Connection 5
3.1 1L1 3L2 5L3 Main circuit Bar 1L1,3L2,5L3 as well as
2T1 4T2 6T3 2T1,4T2 and 6T3. 5
3.2 Control voltage and control circuit 6
4. Setting 9
4.1 Start ramp 9
4.2 Stop ramp 9
4.3 Initial voltage(U INI) / Current limit function (I LIM) 9
4.4 Switch for selection of connection type,
Line / Delta switch S1 10
4.5 Basic settings for different applications 11
5. Maintenance 12
6. Trouble Shooting 12
7. Technical Data 15
7.1 Dimensions 15
7.2 Circuit diagram 16
WARNING
Morethanonelivecircuit-seediagram
Donotoperatemachinewiththegroundingwiredisconnected
WARNING
Theoperation,installationandservicingofthisproductmustbecarriedoutbyaqualifiedelectrician,
followinginstallationstandardsandsafetyregulations.Checkthatyouhavethecorrectsoftstarter
unitinregardstonetvoltage,ratedmotordataandtypeofconnection.
21. Softstarter Marking
89/336/ These softstarters fulfil the
EEC EN 60947-4-2/ demands according to 89/336/EEC
IEC 947-4-2 A and EN 60947-4-2 / IEC 947-4-2,
Equipment class A.
Electric
HPS2S
Type
Rated current range
:
KW Ue :
Mainvoltage level and kW rating ln-line
:
inside-delta
Supply voltage
CE UL
Data according to CE and UL
!
WARN
Do operation by regulation.
Inspection should be perfromed atter cut off power.
E
Thepote E must be Connectedto ground.
Us
Supply voltage Us
1 2 3 4 5 6 7 8 9 10 11 12
I Iim
HPS2 Softstart
ON Green
TOPOF RAMP Green
GENERALFAULT Red
EXTERNALFAULT Red
1L1 3L2 5L3
Terminal marking
of main circuit
2T1 4T2 6T3
Picture 1.13. Connection
3.1 / Main circuit,Terminal/Bar L1 L2 L3
1L1 3L2 5L3 1L1,3L2,5L3 as well as
1L13L25L3
2T1 4T2 6T3 2T1,4T2,6T3. HPS2S
2T14T26T3
All softstarters,HPS2S18/30 to HPS2S300/ V1
515,can be connected both ln Line
U1MW1
(see picture3.1)and lnside Delta (see
picture 3.2,alt.1 and 2)with the motor.
L1 L2 L3 L1 L2 L3
Line / Delta S1 Remember to set the Line/Delta
10 switch S1 in the right position. 1L13L25L3 1L13L25L3
See further on page 10. HPS2S HPS2S
2T14T26T3 2T14T26T3
W1 W2 W1 W2
For mounting of a current trans- V1 M V2 V1 M V2
8 3 .2.6 former for the current limit U1 U2 U1 U2
function,see further instructions
section 3.2.6 on page 8.
Connect the line side to terminals/bars
1L1,3L2,5L3 and motor side to
terminals / bars 2T1,4T2 and 6T3.The
terminal marking is printed on the
softstarter front label.
The softstarter unit is not phase
sequence sensitive
HPS2 S 18/30-500...44/76-500
1L1 3L2 5L3
5.6
5.6
2T1 4T2 6T3 10
HPS2 S 50/85-500...72/124-500
Hapn softstarter range
HPS2 S18/30 300/515Contents
1. Softstarter Marking 3
2. Mounting 4
Drilling plan 4
Minimum distance to wall / front 4
3. Connection 5
3.1 1L1 3L2 5L3 Main circuit Bar 1L1,3L2,5L3 as well as
2T1 4T2 6T3 2T1,4T2 and 6T3. 5
3.2 Control voltage and control circuit 6
4. Setting 9
4.1 Start ramp 9
4.2 Stop ramp 9
4.3 Initial voltage(U INI) / Current limit function (I LIM) 9
4.4 Switch for selection of connection type,
Line / Delta switch S1 10
4.5 Basic settings for different applications 11
5. Maintenance 12
6. Trouble Shooting 12
7. Technical Data 15
7.1 Dimensions 15
7.2 Circuit diagram 16
WARNING
Morethanonelivecircuit-seediagram
Donotoperatemachinewiththegroundingwiredisconnected
WARNING
Theoperation,installationandservicingofthisproductmustbecarriedoutbyaqualifiedelectrician,
followinginstallationstandardsandsafetyregulations.Checkthatyouhavethecorrectsoftstarter
unitinregardstonetvoltage,ratedmotordataandtypeofconnection.
21. Softstarter Marking
89/336/ These softstarters fulfil the
EEC EN 60947-4-2/ demands according to 89/336/EEC
IEC 947-4-2 A and EN 60947-4-2 / IEC 947-4-2,
Equipment class A.
Electric
HPS2S
Type
Rated current range
:
KW Ue :
Mainvoltage level and kW rating ln-line
:
inside-delta
Supply voltage
CE UL
Data according to CE and UL
!
WARN
Do operation by regulation.
Inspection should be perfromed atter cut off power.
E
Thepote E must be Connectedto ground.
Us
Supply voltage Us
1 2 3 4 5 6 7 8 9 10 11 12
I Iim
HPS2 Softstart
ON Green
TOPOF RAMP Green
GENERALFAULT Red
EXTERNALFAULT Red
1L1 3L2 5L3
Terminal marking
of main circuit
2T1 4T2 6T3
Picture 1.13. Connection
3.1 / Main circuit,Terminal/Bar L1 L2 L3
1L1 3L2 5L3 1L1,3L2,5L3 as well as
1L13L25L3
2T1 4T2 6T3 2T1,4T2,6T3. HPS2S
2T14T26T3
All softstarters,HPS2S18/30 to HPS2S300/ V1
515,can be connected both ln Line
U1MW1
(see picture3.1)and lnside Delta (see
picture 3.2,alt.1 and 2)with the motor.
L1 L2 L3 L1 L2 L3
Line / Delta S1 Remember to set the Line/Delta
10 switch S1 in the right position. 1L13L25L3 1L13L25L3
See further on page 10. HPS2S HPS2S
2T14T26T3 2T14T26T3
W1 W2 W1 W2
For mounting of a current trans- V1 M V2 V1 M V2
8 3 .2.6 former for the current limit U1 U2 U1 U2
function,see further instructions
section 3.2.6 on page 8.
Connect the line side to terminals/bars
1L1,3L2,5L3 and motor side to
terminals / bars 2T1,4T2 and 6T3.The
terminal marking is printed on the
softstarter front label.
The softstarter unit is not phase
sequence sensitive
HPS2 S 18/30-500...44/76-500
1L1 3L2 5L3
5.6
5.6
2T1 4T2 6T3 10
HPS2 S 50/85-500...72/124-500
AIGC
尊敬的用戶,您好!關(guān)于"和平軟啟動器安裝及維修說明書",這是一份詳細的指南,它包含了和平品牌軟啟動器的安裝步驟、操作方法、注意事項以及在使用過程中可能出現(xiàn)的問題的解決辦法。這份手冊通常包括以下幾個部分:
1. **產(chǎn)品概述**:介紹軟啟動器的基本特性、型號和適用范圍。
2. **安裝步驟**:指導(dǎo)用戶如何正確地定位、接線和固定軟啟動器到電源和負載設(shè)備上。
3. **接線圖示**:提供清晰的接線示意圖,幫助用戶理解各個端子的功能。
4. **操作說明**:說明如何通過面板或控制面板設(shè)置啟動參數(shù),如頻率、時間等。
5. **故障診斷**:列出常見的問題及其可能的原因,以及相應(yīng)的排查和修理方法。
6. **維護保養(yǎng)**:提供定期檢查和維護軟啟動器的建議,延長其使用壽命。
如果您在安裝或維修過程中遇到任何問題,歡迎隨時向我提問,我會盡我所能提供幫助。祝您安裝順利,使用愉快!
和平軟啟動器安裝及維修說明書的相關(guān)資源推薦
會員專享
會員限時八折,點擊立即查看
升級會員獲取海量資源免費下載
會員免費下載
5D幣 購買
上傳資源賺收益
格式:pdf
瀏覽:1.1k
收藏:0
瀏覽:1.1k??|??
收藏:0
上傳時間:2009-10-13
大小:2.3M
舉報
排名
昵稱
瓦特值